Start Date:

11/12/2026 3:53 PM

End Date:

12/31/2026 3:51 PM

Description:

Construction of the parking garage at Odenton will begin on Monday, November 16. Phase one will be completed and reopened, this is where handicapped parking will be located and where buses will discharge and pick up passengers. The current bus loop and parking closest to the station building and Town Center Boulevard will close. Fencing will be installed and the area will be inaccessible.

There will be ample parking available in the MARC overflow lot on the other side of Route 175/Annapolis Road. Enter Hale Street and Lokus Road, Odenton, MD into your GPS or map app on your mobile device to get directions to the lot. To reach the lot, exit the current lot and turn right onto Town Center Boulevard. Proceed straight through the stoplight at Route 175/Annapolis Road. Turn right at the Hale Street (first right), then proceed straight ahead into the MARC overflow lot. Please allow extra time to drive to the overflow lot and walk the extra distance to the train platform and station.

We regret any inconvenience this construction will cause and appreciate your patience during garage construction. Thank you for riding MARC Train.

Affected Routes:

Cause:

Other Cause

Effect:

Other Effect